How long does it take to build a company website? Real timelines, why projects drag on, and what to prepare
Published timelines put a small company website at 4 to 8 weeks with a professional, but what usually stretches a project into months is content, photos, approvals and domain access that are not ready. Prepare those first, and we deliver an Arabic and English company website in 7 working days, counted from the day your information is complete.
How long does it take to build a company website?
Short answer: the build itself takes days to weeks. The time you live through depends on when the words, photos, approvals and domain are ready.
Published numbers vary with the speaker:
- Elementor’s guide (the website-builder company): a small business site of 5 to 15 pages takes 4 to 8 weeks with a professional.
- Buyers on Mostaql, the Arabic freelance platform: in 19 company-website briefs we opened, the delivery time asked for ran from 1 to 45 days, and 10 of the 19 wanted 5 days or less. Not every buyer there is in Egypt.
- Us: a company website of up to 20 pages in Arabic and English in 7 working days, counted from the day your information and photos are complete.
So owners expect days and the guides say weeks. The gap is rarely the code.
What does a website’s timeline depend on?
- Pages and languages: five pages in one language is a different job from twenty in two, each language written on its own.
- Words and photos: ready, or still to be written and shot?
- Approvals: one person who decides, or every page doing the rounds of several managers?
- Domain and hosting: do you already own a domain, and who can log in to it?
- Integrations: online payment, inventory, customer accounts. An information site rarely needs them; a store does.
The first two set the size of the work; the last three decide whether it moves or stalls. The same factors move the price: see company website cost in Egypt.
Why do company websites drag on for months?
It is rarely a slow designer. Elementor’s guide says it plainly: “The #1 reason projects stall is a lack of prepared content (text and images).” Writing, sourcing and approving content, it adds, “often takes longer than the design and build phases combined.” In practice a project waits on three things:
- “Send us the content”: nobody at the company has time to write the About page between real work, so a week becomes a month.
- Approvals: in the same guide’s words, “A designer who waits three days for approval on a mockup just lost three days,” and a large committee “can be stuck in revisions for a month.”
- Access: the domain is in a former employee’s or an old agency’s name, or nobody remembers the hosting password. For a .com.eg domain, Egypt’s registry asks companies based in Egypt for the commercial register or tax card, plus an ID copy of the owner or an authorised person.
One wait is in nobody’s hands. Google reviews your business details before showing them on Maps, and its help page says “verification reviews take up to 5 business days. On rare occasions, reviews may take longer.” So the site can be live a few days before your pin appears.
What does a realistic plan look like, day by day?
The table sets Elementor’s published plan for a small business site beside ours, as written on our company website page. The last column is your part:
| Stage | Elementor (small business site) | Webdazzle | Your part |
|---|---|---|---|
| Planning and collecting | Weeks 1–2 | Day 1: one call to collect your identity, products and words | Complete information and photos; the count starts here |
| Home and one inner page | Weeks 3–4 (design and revisions) | Days 2–3 | Approve, or ask for one change, on your phone |
| Other pages, content and testing | Weeks 5–7 | Days 4–6: second language, pictures, every page, forms and booking | Answer if we need a fact |
| Launch | Week 8 | Day 7: Google, Maps and tracking, a final review with you, one hour of training | The final review and the training hour |
| Total | 4–8 weeks | 7 working days |
We are not rushing. The count starts once your information is complete, so no weeks vanish into waiting, and tools we have built since 2022 do the repetitive work (page skeleton, Google set-up, sitemap), leaving our time for design and words. If your information arrives late, the date moves by the same number of days. And these are working days: holidays do not count.
What should you prepare so the site finishes fast?
You do not write the website; we write it with you, in Arabic and English. We need facts, in one folder:
- One decision-maker who can say “approved”.
- Your logo in the highest quality you have, and the brand colours if there is a guide.
- Company numbers: year founded, staff, where you operate, main projects or clients, and which clients agree to be named.
- Real photos: the factory, the sites, the products or the team, even from a phone.
- Certificates and papers you want on the site, still valid.
- The domain: if you have one, find out who holds the login. For a .com.eg, have the commercial register or tax card and an ID copy ready.
- Contact details: the WhatsApp number and email for form messages, and your real address for Google Maps.
The same facts build your company profile: see what to include in a company profile.
Does adding a company profile make it take longer?
No. The Tender-Ready package delivers the website, a 12–16-page profile in two languages and the first month of content in the same 7 working days: days 1–3 for identity, words and the website (you approve the home and one inner page), days 4–7 for the other pages, the profile, the content, Google Maps, review and delivery (one more approval). The website and the profile are written from the same facts, so you gather them once instead of twice.
How can you tell whether a quoted deadline is real?
Before agreeing with anyone, ask these and get the answers in writing:
- When does the count start: at the first payment, or when my information is complete?
- Working days or calendar days?
- How many rounds of changes, and at which stage?
- What exactly do you need from me, and by when?
- If I am late, how far does the date move?
- Whose name will the domain be in?
- Do I pay everything up front, or is part due on delivery?
Our answers: from the day your information and photos are complete; 7 working days; one change on the home and inner page, plus a final review with you on day 7; a late input moves the date day for day; the domain in your name and email; half to start, half on delivery.
In short
- A 5–15-page small business site takes a professional 4 to 8 weeks, says Elementor’s guide.
- The big delays usually sit inside the company: words and photos, approvals, and domain access.
- Google’s review before you appear on Maps takes up to 5 business days, out of your hands and ours.
- Before you start, line up one decision-maker, the logo, the numbers, the photos and the domain login.
- With us: 7 working days from complete information, for the website alone or with the profile.
Want to know how long your site would take? Send your company name and current site link, if any, and we will tell you what we need to start. Details are on the company website design page (EGP 15,000, fixed); with the profile too, the Tender-Ready package is EGP 22,000.
Questions we get a lot
How long does it take to build a company website?
With a professional, a small business site of 5 to 15 pages takes 4 to 8 weeks, according to Elementor’s guide. With us it is 7 working days for up to 20 pages in Arabic and English, counted from the day your information and photos are complete.
What delays a company website the most?
Content that is not ready: the words and the photos. After that come approvals that pass through several people, and access to an old domain or hosting account.
When do the 7 working days start?
From the day your complete information and photos reach us. If the information is late, the date moves by the same number of days.
Do I have to write the website text myself?
No. We write it with you: you give us the facts, such as the year founded, projects, clients and certificates, and we shape them in Arabic and English.
Will my company show on Google Maps on delivery day?
Not necessarily. Google reviews the details first, and its help page says the review takes up to 5 business days, occasionally longer. It also needs your company’s real address.
Do a website and a company profile together take longer?
No. In the Tender-Ready package the website, the profile and the first month of content are delivered in the same 7 working days, because they are written from the same facts.
What do I need to register a .com.eg domain?
According to Egypt’s registry, domain.eg, a company based in Egypt submits its commercial register or tax card, plus an ID copy of the owner or an authorised person.